img

Premium house at an affordable price

In order to obtain the best permeability parameters of partitions in our houses, we use only proven top-shelf materials.

View offer Make an appointment
img

Hausformator we will build 70m2 house in 21 Days

Completion time is counted from the execution of the foundations. In order to build a house at the customer's premises, the foundations must be given sufficient strength. Therefore, it is necessary to wait 21 days before placing a house on them.

View offer Make an appointment
img

Hausformator is a guarantee of high quality

Buying a house in Hausformator you get a 5-year warranty. During this time, our service will remove all possible defects. It is possible to extend the warranty to 10 years for an additional fee.

View offer Make an appointment
14 Production plants
82 Production Specialists
17 Manufactured Modules

Model GX53a / GX53b

Dom Całoroczny / Poddasze użytkowe

Pow. podłogi

84,60 m2

Pow. zabudowy

53,00 m2

Pokoje

5

GX53

#
PROMOCJA Hausformator

CAŁY MIESIĄC PROMOCJI WSZYSTKIE MODELE GX53 W NIŻSZEJ CENIE

RABAT NA MODELE GX53

Miesiąc promocji trwa od 07 lipca do 07 sierpnia

Zobacz gotowe domy w naszym zakładzie

11.11.2222

  • days
  • Hours
  • Minutes
  • Seconds
HAUSFORMATOR

MODULAR HOUSES OFFER / COMPLETION 21 DAYS

What is the Hausformator network

Comprehensive Home Building Service

02

Hausformator shops

Home Sales Points located in shopping galleries, providing sales, customized project creation, and order fulfillment supervision.

14

Production Plants

Hausformator is an extensive network of production plants building houses in modular technology. Thanks to this, we have a very large production capacity.

05

Installation teams

The house produced in the plant is delivered to the customer in spatial modules, which are assembled by a specialized Hausformator team.

Hausformator technology

The supporting structure of the building is made of steel frames of the modules (standard dimensions 6.0m x 3.0m). The frames of the modules are filled with a wooden grate made of C24 structural timber with insulation adapted to the requirements for a year-round house WT2021.

We make the house in one of our production plants. Ready modules with installed doors and glazing are transported to the customer. On-site assembly typically takes 2 days.

about
img

25 years of experience in construction

Preliminary informations

Building type / Area / Completion time

The first step is to determine the building area and the type of roof of the building. This will determine the total cost of the investment. Our offer includes one-story houses and houses with a gable roof. When deciding on the type of building, check the local zoning plan to see if a specific angle of roof inclination is required on your plot. View more

img
Produced
Modules

13

Play video

Hausformator company

We are a manufacturer of energy-efficient homes that are gaining increasing worldwide popularity. Our company puts every effort into providing high-quality services. We approach each order individually and with full professionalism, satisfying the needs of even the most demanding customers.

Nasza Produkcja

What does the production plant look like

Experienced team, fast and professional order execution. Unlike the competition, we offer the possibility of visits to our production plant.

Building procedure

Building a house step-by-step

img

1. Model selection

The first step is to check the requirements in the local spatial development plan.

One-story houses with flat roofs are not allowed everywhere. If a specific roof pitch is required, choose one of our gable roof models.

When deciding on a house from our offer, you should add the total cost of services:

  • House model (e.g. GX35)
  • Transportation (depends on distance)
  • Foundations
  • Extras (e.g. heating)

At this stage, the customer already knows the final price, with no hidden costs.

View offer
img

2. Project modification

After signing the contract, the client arranges a meeting with our architect.

The offer for each house model provides for changes in the division of rooms. Changing the windows position is also possible. During consultation with the architect, the arrangement of the installation's outlets is also determined.

  • Rooms Layout
  • Arrangement of installation leads
  • Location of windows
  • Number of windows
View more
img

3. House construction

The house is being built in a manufacturing plant. During production, the customer has the opportunity to see his home at every stage of assembly.

The construction of a 70m2 house usually takes 14 days. After this time, the house is placed on the square in front of the production hall. Then the customer is invited to the technical acceptance. At this stage, the house is completely finished in the case of a wooden facade. With a plastered facade, the house is covered with a layer of mesh with glue and our team plasters the building only after assembly at the customer's site.

  • Fast
  • Professionally
  • Control at every stage
  • Final inspection
View more
img

4. Delivery and Assembly

After final acceptance at the production plant and final payment, the house is transported to the customer by trucks with HDS.

The house arrives divided into 6m x 3m modules. On site, they are placed on the foundations and the assembly stage begins. For a plastered facade, it usually takes 2-3 days. With a wooden façade, it is 1 day. If the customer plans to move the house in the future, the modules are screwed together. Otherwise, the steel frames are spot welded. From the time the work is completed, the customer has a 5-year warranty coverage for the repair of defects.

  • Assembly 2-3 days
  • Fully finished facade
  • Insured transport
  • Warranty 5 years
View more
Our team

Meet Hausformator professionals

img

Vlad

Hausformator Production Manager
img

Andrzej

External assembly manager
img

Andrzej

Assembler of wooden structures
img

Maciek

Head of the Welding Shop
img

Vlad

Assembler of wooden structures
img

Aleksander

Assembler of wooden structures
img

Siergiej

Assembler of wooden structures
img

Dimitri

Assembler of wooden structures
img

Ryszard

Specialist for sanitary installations
img

Tatiana

Assembler of wooden structures
Hausformator Headquarters

Production plant in Wrocław

Our friendly atmosphere makes it easier for us to contact the client.

img

Radosław Staroszczyk

President of the Management Board

img

Alex Staroszczyk

Director of Sales

img

Anita Piasecka

Organizational Director
Main Architect

img

Piotr Brandys

Logistics

img

Maria Grażyńska

Marketing specialist

img

Agnieszka Wadelska

Sales Manager

img

Wiktoria Wasiluk

Interior designer

img

Alicja Kola

Interior designer

Our selection

Partners and trusted producers

Taking care of the quality of our products, we cooperate only with the best suppliers of building materials.

Contact form

Make an appointment at the plant

Are you interested in our houses? Visit us at the production plant and see buildings in progress live.

Quick questions

Frequently Asked Questions

Our team of specialists has developed answers to the most frequently asked questions asked by our customers.

The Hausformator modular technology has been specially developed so that the building meets the WT2021 technical conditions for the construction of a year-round house.

As a standard, with a plastered facade, we insulate the external walls with 14cm of rock wool and 7cm of polystyrene. For the wooden façade we use 20 cm of rock wool.

During the final assembly, we consult with the client whether he plans to move the building in the future. Depending on this, we choose the appropriate method of connecting modules. Spot welding or screwing.

The house is manufactured in a production plant. Modules for a 70m2 house are ready after 14 days. Installation on the plot takes 2 days. In our offer, we guarantee the customer the construction of a house within 21 days from the moment of pouring the foundations.

We give a 5-year warranty on all our houses. During this time, in case of any faults, the customer will receive help from our service team. If the materials we use have a longer warranty period, it is transferred to the customer.

Visit us at the production plant

Follow Us

Top